Skip to content

Brouillard #15

“With this project I fabricate sequences by in-camera layering of repeated trajectories inside a path extending from my family’s home into Lac Saint-Charles. The image-capturing process produces a sedimented landscape that gradually unfolds while simultaneously disintegrating under temporal displacement. Approximately 30 long takes begin at the same frame on the film strip, all shot at a high frame rate. My walking rhythm varies for each trajectory, resulting in the space progressively expanding in depth until I reach the edge of a dock. The duration of the long take corresponds to the length of the celluloid reel, a thousand feet of 35mm film.”—Alexandre Larose

10m2014NR

English

Crew and Cast

Storyline

“With this project I fabricate sequences by in-camera layering of repeated trajectories inside a path extending from my family’s home into Lac Saint-Charles. The image-capturing process produces a sedimented landscape that gradually unfolds while simultaneously disintegrating under temporal displacement. Approximately 30 long takes begin at the same frame on the film strip, all shot at a high frame rate. My walking rhythm varies for each trajectory, resulting in the space progressively expanding in depth until I reach the edge of a dock. The duration of the long take corresponds to the length of the celluloid reel, a thousand feet of 35mm film.”—Alexandre Larose

You Might Also Like

Info

Status
Released
Released
24 October 2014
Runtime
10m
Rating
NR

Production

Countries
Canada

Languages

Original
English